LINQ
Bombard installed underground mechanical chilled water piping from central plant down Linq Blvd. thru High Roller/valet parking. Extended above ground along Linq parking garage to new transfer station (3 new heat exchangers/pump, expansion tanks ect. with HVAC controls). From transfer station through loading dock to casino roof level — installed new rooftop air handler retro fit to existing air handler. Remodeled Linq Towers 1-5 with mechanical, HVAC, plumbing replacement for all rooms.