25
Aug

Resorts World Las Vegas

Resorts World Las Vegas Resorts World sits on an 87-acre site that was previously home to the iconic Stardust Resort and Casino. The property consists of: 117,000-square-foot casino Spa and fitness center Theater with seating for 5,000 14 bars and restaurants Convention space and banquet kitchen Pool deck totaling 5.5 acres of space Nightclub and day club Each of the
Read more
8
Jun

Caesars Palace

Caesars Palace Bombard Mechanical's work history at Caesars Palace is extensive. Our team of experts has completed HVAC, plumbing and mechanical piping work in the Nobu Tower and Restaurant, the Colosseum, the Octavius Tower, the Race and Sports Book Bar, the Palace Court High Limit poker room and many more.
8
Jun

Cosmopolitan

Cosmopolitan This project included HVAC, plumbing and mechanical piping for three restaurants: Scarpetta, Jaleo, and Blue Ribbon Sushi Bar and Grill.
8
Jun

The Cromwell

The Cromwell The Cromwell contract included $20.4 million in plumbing and mechanical services, including an overhaul of the casino, a basement after hours club remodel, a roof-level beach/nightclub, a four-story room remodel, a new parking garage and a loading dock.
8
Jun

Bishop Gorman High School

Bishop Gorman High School The $12 million contract for this state-of-the-art private school included work in classrooms, the central plant, mechanical penthouses, the gym, football stadium and a performing arts facility.
30
Apr

MGM Convention Center Expansion

MGM Convention Center Expansion The MGM Grand Convention Center Expansion project will be a 264,270-square-foot extension south of the existing convention center. The existing valet tunnel will be remodeled as part of this project. The project will consist of three levels above grade and one level below grade. New spaces on Level 1 will consist of an exhibition hall, meeting
Read more
30
Apr

LINQ

LINQ Bombard installed underground mechanical chilled water piping from central plant down Linq Blvd. thru High Roller/valet parking. Extended above ground along Linq parking garage to new transfer station (3 new heat exchangers/pump, expansion tanks ect. with HVAC controls). From transfer station through loading dock to casino roof level -- installed new rooftop air handler retro fit to existing air
Read more
30
Apr

Eastside Cannery Casino & High-Rise

Eastside Cannery Casino & High-Rise This 16-story high-rise hotel and casino has 12 floors of rooms, 1 level of offices, multiple restaurants, back of house kitchens, mechanical rooms, central plant, grand ballroom and meeting rooms. Our work consisted of all mechanical and plumbing systems. We also installed standing seam roof along with metal exterior panels.
30
Apr

Clark County Detention Center

Clark County Detention Center This 12-story detention facility remodel included removal and replacement of all underground systems (grease waste and interceptor, sanitary sewer lift stations, and storm drain), kitchens, laundry facilities, central plants, mechanical rooms, prison cells, day rooms, medical facilities, metro offices and locker rooms. Our work consisted of a complete mechanical and plumbing system upgrade to meet current
Read more
30
Apr

South Point Arena and Bowling Center

South Point Arena and Bowling Center This South Point project consisted of a new 240,000-square-foot equestrian arena and bowling alley. Our work consisted of a complete mechanical system installation with a central plant renovation and full BIM coordination. Custom AHU and VAV system install with humidification control.